Sample calculation tanks sounding attached below (the Temp below should be 34 C). – T 54B (VCF) > Density 15*C 0.9903 = 0.9870 (see the above picture you need to interpolate if any different numbers on both columns).ĪSTM Table 54B – T 56 (WCF) : Density 0.9903 = 0.9892 – The Quantity in Metric Ton = Oil Vol x VCF x WCF, Tank Volume at Sounding 3.20 M = 157.20 Cubic Meter, Temperature = 34*C,and density 15*C = 0.9903 (given density). 1 Center, Corrected Sounding = 3.27 Meter, Now we could go with sample of 1 tank to test the calculation.įO Tank No. – Oil Density Table ASTM 54B (VCF) and Table ASTM 56 (WCF). The Corrected Sounding means below is the sounding after correcting with vessel’s trim and list. – Tank Sounding data and Tank Capacity Table. The bunker calculation is simple and needs the following:
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |